Left Elevator Trim Tab Construction

A time lapse video up to and including drilling and dimpling.  I had an issue at the end with the microstop countersink slipping and I am waiting on some “oops rivets” to arrive to finish it.  I’ll start on the right tab tonight.

 

[stream flv=x:/www.brunbergs.net/wp-content/uploads/2015/04/lefttrimtab1.240p.flv img=x:/www.brunbergs.net/wp-content/uploads/2015/04/TrimTabShot1-300×169.jpg mp4=x:/www.brunbergs.net/wp-content/uploads/2015/04/lefttrimtab1.mp4 embed=false share=false width=640 height=360 dock=true controlbar=over bandwidth=high autostart=false responsive=16:9 /]

3 thoughts on “Left Elevator Trim Tab Construction”

  1. wow – you are really ramping up the activity here – I’ll have to remember to check back more frequently now 🙂

Leave a Reply to your sister :) Cancel reply

Your email address will not be published. Required fields are marked *